Click to enable zoom
Searching...
We didn't find any results
open map
View Roadmap Satellite Hybrid Terrain My Location Fullscreen
Your search results

Hondon de las Nieves | CMGTV 403688

€ 342.000
villa Hondon de los Nievesvilla Hondon de los Nievesvilla Hondon de los Nievesvilla Hondon de los Nievesvilla Hondon de los Nievesvilla Hondon de los Nievesvilla Hondon de los Nieves

Beautiful luxury unfurnished villa in Hondón de las Nieves (El fondo de les Neus). 

The perfect places to spend time with your loved ones. The villa contains 3 bedrooms, including 3 private bathrooms, the bathrooms are finished with top quality sanitary ware and with built-in sink, there is also 1 guest toilet on the ground floor.

Among other things, the villa has a covered terrace, swimming pool, barbecue area and possibility to add a parking space. GARAGE IS OPTIONAL.

The Villa GTV-4 | has an area of 229.33 m² with a private garden of 229.92 sqm and a cellar of 92.79 sqm. price is 342.000€ 

Layout :

The villas consist of a living-dining room with large sliding door to the garden, open plan kitchen. In this project, all villas have fully built-in kitchens with granite or synthetic agglomerate countertops, porcelain or floating floor tiles, indoors as well as smooth plaster ceilings. At the front of the villas there is 1 bedroom on the ground floor with a private bathroom and guest toilet.

Layout 1st floor:

Corridor with 2 bedrooms, 2 private bathrooms and a balcony terrace of 36.62 sqm. 

 

Garden

The garden contains a private swimming pool and a covered terrace, on the side of the covered terrace is a barbecue area and a sink. There is enough space to possibly add a parking space. The villas are equipped with a power point for charging electric vehicles and have private access from the street.

Services

The villas also have air conditioning with air ducts, forced ventilation with heat recovery, Aero thermal system, fitted wardrobes, shutters and photovoltaic panels. Private pool, Barbecue, En-suite bathrooms, Fitted wardrobes, Cellar, Guest toilet,

 

Orientation: South |   Distance to facilities: 0.2 Km |  Distance to airport: 33.5 Km |  Distance to the beach: 36 Km |  Distance to golf course: 20 Km.  

Documents
State/ County:
Zip: 03688
Country: Spain
Open In Google Maps
Property Id : 53578
Price: € 342.000
Property Size: 0,00
Property Lot Size: 0,00
Rooms: 4
Bedrooms: 3
Bathrooms: 3
Air conditioning / Pre-installation
    Internet / Telephone / TV
Access control and intercom
Drinking water
Electricity
Insulated glass - Double glass
Plastic frames (PVC)
Window shutter manually
Swimming pool
Enclosed garden
Cellar
Balcony
Option garage
East facing
South facing
Mountains oriented
Paved road
Floor plans
Floor plans
Terrain plan
Terrain plan

Similar Listings

Hondon de las Nieves | CMGTV 303688

€ 337.250
Beautiful luxury unfurnished villa in Hondón de las Nieves (El fondo de les Neus). The perfect places to [more]
Beautiful luxury unfurnished villa in Hondón de las Nieves (El fondo de les Neus). The perfect places to [more]
33 0,00 Full info

Hondon de las Nieves | CMGTV 703688

€ 346.750
Beautiful luxury unfurnished villa in Hondón de las Nieves (El fondo de les Neus). The perfect places to [more]
Beautiful luxury unfurnished villa in Hondón de las Nieves (El fondo de les Neus). The perfect places to [more]
33 0,00 Full info

Hondon de las Nieves | CMGTV 803688

€ 342.000
Beautiful luxury unfurnished villa in Hondón de las Nieves (El fondo de les Neus). The perfect places to [more]
Beautiful luxury unfurnished villa in Hondón de las Nieves (El fondo de les Neus). The perfect places to [more]
33 0,00 Full info

Hondon de las Nieves | CMGTV 603688

€ 346.750
Beautiful luxury unfurnished villa in Hondón de las Nieves (El fondo de les Neus). The perfect places to [more]
Beautiful luxury unfurnished villa in Hondón de las Nieves (El fondo de les Neus). The perfect places to [more]
43 0,00 Full info

Contact Me

    • Uitgebreid zoeken

      More Search Options

    Compare Listings

    en_GBEnglish (UK)